INDIRECT UTILITY DECISION Closed

Copper Valley Electric's shelved nuclear reactor study

Copper Valley Electric studied putting a 10 megawatt micro modular reactor into its isolated Glennallen and Valdez system, which is connected to no other utility and burns liquid fossil fuel for roughly a third of its power. The cooperative finished a pre feasibility study, published it, and then tabled the project indefinitely.

DECIDES · COPPER VALLEY ELECTRIC ASSOCIATION BOARD

How the public reaches this

Copper Valley Electric is a member owned cooperative, so its board answers to ratepayers who elect it. The project is tabled, so there is nothing before the board to comment on now.

Timeline

FEB 2 2022Study announced with Ultra Safe Nuclear Corporation
AUG 9 2023Board tables the project indefinitely

Sources

Every document a fact on this page was checked against.

  1. Copper Valley Electric Association

    2026-08-06
  2. Copper Valley Electric Association

    2022-02-02
  3. World Nuclear News

    2024-10-30

How this decision moved

One dated line per material change, oldest first.

  1. 2026-08-06 Added as a closed item, because a reader asked for its approval timeline and there is none. The cooperative's own project record is headed that the micro modular nuclear reactor project was tabled indefinitely, dated August 9th, 2023, and the completed pre feasibility study is posted publicly beside it. The study partner, Ultra Safe Nuclear Corporation, filed for Chapter 11 on October 29th, 2024, and its micro modular reactor business was sold to another company in December 2024. Recording it here rather than leaving it out, because what a utility considered and shelved is part of the record, and a reader looking for this timeline deserves to find the answer rather than nothing.

  2. 2026-09-06 Checked and unchanged. The cooperative's project page still carries the August 9th, 2023 release headed that the micro modular nuclear reactor project was tabled indefinitely, with the completed pre feasibility study and the 2023 public meeting materials posted beside it. Nothing newer has been added.

Cite this

Alaska AI Docket, Copper Valley Electric's shelved nuclear reactor study. Tracked since August 6th, last verified September 6th. https://alaskaaihq.com/docket/cvea-micro-modular-reactor/ · Reuse permitted under CC BY 4.0 with attribution. This decision is also available as structured data in the docket JSON, item id cvea-micro-modular-reactor.

Questions about this decision

Answered from this record, rebuilt every day. The same answers come back instantly from the box on the docket page, where you can ask about anything else on it.

What is Copper Valley Electric's shelved nuclear reactor study?
UTILITY DECISION

Copper Valley Electric studied putting a 10 megawatt micro modular reactor into its isolated Glennallen and Valdez system, which is connected to no other utility and burns liquid fossil...

Who decides Copper Valley Electric's shelved nuclear reactor study?
WHO DECIDES

Copper Valley Electric Association board

Can I comment on Copper Valley Electric's shelved nuclear reactor study?
NOT A FORMAL COMMENT

Copper Valley Electric is a member owned cooperative, so its board answers to ratepayers who elect it. The project is tabled, so there is nothing before the board to comment on now.

Where is Copper Valley Electric's shelved nuclear reactor study?
WHERE

Glennallen, Copper River Basin

Has Copper Valley Electric's shelved nuclear reactor study been decided?
STATUS

It is closed. Added as a closed item, because a reader asked for its approval timeline and there is none. The cooperative's own project record is headed that the micro modular nuclear...

What happens next with Copper Valley Electric's shelved nuclear reactor study?
WHAT HAPPENS NEXT

No further date is published. It is closed and the record is checked against its source every day.

What changed on Copper Valley Electric's shelved nuclear reactor study?
LAST MOVED AUGUST 6TH

Added as a closed item, because a reader asked for its approval timeline and there is none. The cooperative's own project record is headed that the micro modular nuclear...

What kind of decision is Copper Valley Electric's shelved nuclear reactor study?
TYPE

A utility decision, decided by Copper Valley Electric Association board.

When did Copper Valley Electric's shelved nuclear reactor study start?
TRACKED SINCE

Tracked since August 6th, 44 days ago. The earliest date on its record is February 2nd, 2022.

Where can I read the sources for Copper Valley Electric's shelved nuclear reactor study?
2 SOURCES

Copper Valley Electric Association, World Nuclear News. Every one is listed with its date on the decision page.

Beats

This decision is tracked on Alaska power and the grid. Each beat page keeps every decision and every article on that subject in one place.