INDIRECT UTILITY DECISION Closed

Copper Valley Electric's shelved nuclear reactor study

Copper Valley Electric studied putting a 10 megawatt micro modular reactor into its isolated Glennallen and Valdez system, which is connected to no other utility and burns liquid fossil fuel for roughly a third of its power. The cooperative finished a pre feasibility study, published it, and then tabled the project indefinitely.

DECIDES · COPPER VALLEY ELECTRIC ASSOCIATION BOARD

How the public reaches this

Copper Valley Electric is a member owned cooperative, so its board answers to ratepayers who elect it. The project is tabled, so there is nothing before the board to comment on now.

Timeline

FEB 2Study announced with Ultra Safe Nuclear Corporation
AUG 9Board tables the project indefinitely

Sources

Every document a fact on this page was checked against.

  1. Copper Valley Electric Association

    2026-08-06
  2. Copper Valley Electric Association

    2022-02-02
  3. World Nuclear News

    2024-10-30

How this decision moved

One dated line per material change, oldest first.

  1. 2026-08-06 Added as a closed item, because a reader asked for its approval timeline and there is none. The cooperative's own project record is headed that the micro modular nuclear reactor project was tabled indefinitely, dated August 9th, 2023, and the completed pre feasibility study is posted publicly beside it. The study partner, Ultra Safe Nuclear Corporation, filed for Chapter 11 on October 29th, 2024, and its micro modular reactor business was sold to another company in December 2024. Recording it here rather than leaving it out, because what a utility considered and shelved is part of the record, and a reader looking for this timeline deserves to find the answer rather than nothing.

Cite this

Alaska AI Docket, Copper Valley Electric's shelved nuclear reactor study. Tracked since August 6, 2026, last verified August 6, 2026. https://alaskaaihq.com/docket/cvea-micro-modular-reactor/ · Reuse permitted under CC BY 4.0 with attribution. This decision is also available as structured data in the docket JSON, item id cvea-micro-modular-reactor.

Beats

This decision is tracked on Alaska power and the grid. Each beat page keeps every decision and every article on that subject in one place.