On March 27, 2026 the Anchorage Assembly adopted ordinance AO 2026-27 in a 10 to 2 vote, defining data centers in the municipal zoning code for the first time. It confines them to commercial and industrial zones, requires landscaping buffers and enclosed power equipment, and requires written statements from electric and water utilities that the grid has sufficient system capacity before a project proceeds. Members Scott Myers and Keith McCormick voted against it.
How the public reaches this
The elected Anchorage Assembly adopted the ordinance in a public 10 to 2 vote. Residents reach it through Assembly elections and public testimony.
Timeline
Sources
Every document a fact on this page was checked against.
How this decision moved
One dated line per material change, oldest first.
2026-07-18 Tracked from this run. Anchorage adopted the data center land use framework 10 to 2 on March 27, the first local guardrail of its kind in the state. Sponsored by Anna Brawley and Daniel Volland. Added because Carousel No. 10 turns on whether a Railbelt data center helps or hurts ratepayers, and this ordinance is the one enacted local guardrail while the state bill stalls.
Articles on this decision
Each of these verified a claim against a document this decision also rests on.
Cite this
Alaska AI Docket, Anchorage data-center zoning ordinance AO 2026-27.
Tracked since July 18, 2026, last verified
July 18, 2026. https://alaskaaihq.com/docket/anchorage-ao-2026-27-data-center-zoning/ · Reuse permitted under